We are happy to inform you that we have been awarded by BASF Antwerpen N.V.
for the turn-key delivery of the 2 Riding Gangways with electrical slewing jib crane
for easy manoeuvring of the aluminium gangway ladder.
The cranes are fully electric driven and suitable for Zone 2, ATEX IIB T3
Next Article
We are happy to inform you that we have been awarded with an impressive project
for the supply of a Multi Product Hose Tower in the Middle East. (Turn-Key)
In our scope are the Overall Design, Detail Engineering, (Mechanical, Hydraulic and Electrical) The supply of workshop drawing for local fabrication if the maintower structure. Project management and QA-QC Management
Local installation of hydraulic and electrical systems including piping, hoses, cables and wiring. Commissioning, start up and training on site.

The Hosetower contains
15 hose loading arms , 4 x sliding beams with 1,5 ton winch
1 x SHF Cranes hydraulic knuckle boom crane 1,5 ton at 21 m
Complete hydraulic system with powerpack and emergency system.
Complete electrical control system (E&I with wireless Radiographic remote controls, drip tray with GVK grating, Drip tray control stations, PLC System Control system,
Lighting system, Emergency Lighting , Sprinkler system
1x maintenance (nitrogen) crane, 2 x 6" nitrogen carbon steel jumper arms, 4 x Nitrogen hose reels with ¾ " hoses. 2 x safety showers, 2 operator cabins with HVAC
All suitable for Hazardous area Atex Zone 1 Eexd-IIb T4.
Next Article
We are happy to inform you that we have been awarded by Bam Leidingen en Industries B.V.
for the turn-key delivery of the Access Gangway Systems and Jetty Cranes for Vopak Westpoort Amsterdam Project.
We will deliver 4 Access Gangway Systems with Cranes and 6 Pedestal mounted Jetty Cranes
All systems are fully electric driven and suitable for Zone 1 , ATEX IIB T3